-40%
110V 30Mpa AutoShut Air Compressor Pump 4500PSI High Pressure PCP W/ Accessories
$ 142.5
- Description
- Size Guide
Description
Specification:Condition: 100% Brand New and High Quality
Type:Air Compressor Pump
Material: Made of high quality Stainless Steel, Durable and Reliable
Color: Blue (as picture shown)
Power: 110V
Current
:
20A
Motor Power: 1800W
Charge pressure: 30MPA
Air flow rate: 50L/MIN(13.2GPM)
Working Pressure: 300BAR 30MPA 4500PSI
Pressure Range: 0-40 MPA
Connector type: 8mm, American tire connector
Cooling System: Water & air double cooling methods
Size: 14.5"x 7.3"x 13.8"
Plug Type: US Standard Plug
Item Weight: 19 KG
Application: Industrial high voltage test, high pressure container inflation
Features:
Noise reduction: Low operation sound
Easy operation: The thermometer shows the current temperature of the cylinder
Stable function: Use copper wires, with the frequency of 1800w
Quick air inflation: Double recycle system, make the quick air inflation
Spray technology, excellent waterproof: Apply high-tech metal spray technology, anti-corrosion, waterproof, reliable quality.
Luminous piezometer: Accurate measure, use inflatable pointer to avoid vibrating
Explosion proof valve & overload protection set: Water & air double cooling methods, water cooling cycle
Package Included:
1 x Air Compressor Pump With Accessories (As pictures shown)
Operation instruction:
1. Take out the product; install the hose at the air outlet.(Note: gasket is needed, or air leakage might exist.)
2. Connect 2 cold water pipes and connect them to the water pump. (Note: the lower pipe connected to the water pump is water inlet; sinking pump is used in this product. The water pump should be immersed in water for using.)
3. Install the pressure relief valve screw; pressure relief valve screw is installed at the pressure relief hole under the hose.The blow-down valve is installed at the
drain outlet of the first air chamber block.
4. Immerse the water pump in water and switch on the power.
5. Connect the container need to be inflated, make sure the connection is correct.
6. Screw up the screws of the blow-down valve and pressure relief valve.
7. Switch on the power ant the machine operates. Note: when the machine is operating, the water must operate correspondingly, or the product might be damaged due to overheated, personal harm may even occur.
8. After the inflation is completed, screw of the pressure relief valve should be firstly loosen, then the power is to be switched off, by doing so, high pressure
air backlash caused due to sudden failure of power supply would be avoided, which could lengthen lifetime of the product, as well as discharge high pressure air in the machine.
Warning:
1. Please use the power supply according to the parameter table.
2. If abnormal noise occurred during the using of the product, please stop using it instantly and check the cause.
3. The product should be placed at a place that it couldn’ t be touched by children.
4. Please do not use it in moist and flammable place.
5. Please do not modify it arbitrarily, disassembling and repair by non-technical personnel is not allowed.
6. Make sure the socket could withstand a currentgreater than 8A before using it, or the circuit might be burnt, the product might be damaged and the dangers may be caused due to overload of the socket.
7. Please do not touch the head section after the machine was just being used, so as to not beburnt by high temperature.
8. Please do not leave without authorized, or the product might be damaged by increasingly rising pressure, sustained overload motor, even halt due to the operation pressure has reached but it is not turned off timely.
9. When it is used for inflating slightly larger container, the cooling water should be changed every 30 minutes, in this way, the cylinder
temperature could be better controlled.
10. The machine oil should be checked regularly, make sure the oil level is above the upper edge of the red point. If color of machine oil becomes dark and black, it should be changed in time.
Payment
We only accept the payment through PayPal.
Delivery detail
Delivery detail
A
ll USA orders get shipped within 2-3 business day from our CA warehouse directly.P
lease
provide an valid and correct shipping address.
Note:
some are
shipped from our HK warehouse,it will be shipped within 10 days
when payment received.
Import duties and any other fee are not included in the item costs or shipping costs.Buyers are
responsible for those charges.
Warranty & Return
If buyer want to return the product without any problem,buyer should pay return shipping fee.The item must be returned
in good condition and its original packaging and accessories, never installed or mounted.We will not accept returns
after 30 days of delivery date.
About us
We are a professional factory store.All product use high quality
material and advanced technology.If you can't find a satisfied paint scheme fairing in our store, please contact
us, we can customize any designs you like.
Feedback
100% Positive feedback, your truely feedback is very important for us
.
We will surely solve the problem for you satisfactoriness (100% communication,100% replacement)
On Jun-02-21 at 19:55:13 PDT, seller added the following information: